OUR PROJECTS

Proven in the field.
Built on experience.

Reference projects in mechanical and electrical engineering, inspection and equipment supply from our 2026 company profile.

E-House and R-House fabrication project
FEATURED / FABRICATION & ASSEMBLY

Structures that support
industrial operations.

Fabrication and assembly of six E-House and R-House pontoon units for Mae Moh Overburden V, Phase 9 Line B.

Project details
PROJECT REFERENCES

Every project. Our commitment.

10 reference projects
E-House & R-House pontoon fabrication
ITD PHASE 9 / FABRICATION

E-House & R-House pontoon fabrication

V.C.C. ENGINEERING / ITD

Fabricated six units for motor drive control and resistor systems on Phase 9 Line B.

Scope of work

Approximately 49,800 kg of structural steel, AWS D1.1 welding, three-layer coating and FAT including NDT and coating thickness checks.

Cable reel retrofit — Stacker No.4
MAE MOH / ELECTRICAL

Cable reel retrofit — Stacker No.4

Mae Moh Power Plant / Mine

Converted a mono-drum reel to a spiral reel, with control modifications and 6.6 kV cable installation.

Scope of work

Structural and control design, safe lifting and dismantling, PLC integration and on-load commissioning.

400 kVA distribution transformer supply
EGAT / EQUIPMENT SUPPLY

400 kVA distribution transformer supply

EGAT / Mae Moh Mine

Supplied a QTC three-phase 6.6 kV/400–230 V transformer with a mobile pontoon base.

Scope of work

Included HV/LV cable boxes, protection devices, test documentation, as-built drawings and operation and maintenance manuals.

Coal conveyor power cable replacement
MAE MOH / ELECTRICAL

Coal conveyor power cable replacement

Substation D / Mae Moh Mine

Replaced outgoing feeder cables and completed 22 kV high-voltage cable splicing.

Scope of work

Installed cables via cable bridges to conveyor cabinets and completed six 22 kV cable joints to project requirements.

E-House & R-House structural restoration
ITD PHASE 9 / STRUCTURAL

E-House & R-House structural restoration

V.C.C. ENGINEERING / Mae Moh

Restored electrical and resistor house structures for the conveyor system.

Scope of work

Replaced damaged sections using over 8,000 kg of SS400 steel, with epoxy primer and ancillary repairs.

Cable reel upgrade — Reclaimer 3
MAE MOH / SYSTEM UPGRADE

Cable reel upgrade — Reclaimer 3

Mae Moh Power Plant / Mine

Upgraded the cable reel and converted control communications to a fiber optic network.

Scope of work

Structural and control engineering, 6.6 kV and fiber optic installation, PLC integration and commissioning.

1,200 kW planetary gearbox assessment
KONBURI SUGAR / INSPECTION

1,200 kW planetary gearbox assessment

Konburi Sugar Public Company Limited

Assessed two mill-drive gearbox units ahead of shutdown to define the overhaul scope.

Scope of work

External inspection, gear train examination, wear analysis, NDT, bearing and lubrication assessment.

Installation engineering — WL2 BLT Expansion
HONGSA POWER / ENGINEERING

Installation engineering — WL2 BLT Expansion

SAHAKOL EQUIPMENT / Hongsa Power (HPC)

Developed conveyor equipment installation methods and supported commissioning.

Scope of work

Method statements and lifting plans for drive assemblies, brakes and take-up winches, with site QA/QC and vibration analysis.

Electrical inspection — Thammasat University
THAMMASAT / ELECTRICAL

Electrical inspection — Thammasat University

Thammasat University

Full-site electrical inspections, safety verification and system performance assessment.

Scope of work

Delivered improvement recommendations and compliance documentation.

Major overhaul — 1,000 T/H jaw crusher
MAE MOH / MECHANICAL

Major overhaul — 1,000 T/H jaw crusher

Lotus Hall Machinery / Mae Moh FGD

Overhauled and improved a high-capacity jaw crusher rated at 1,000 tons per hour.

Scope of work

Condition assessment, dismantling, repair planning, component refurbishment, reassembly and performance testing.